Table 2. Overview of Eagle Plain oil and gas scenario.

Land use sector Description
Oil and gas Study Area: Eagle Plain
Scenario Summary:
Natural Gas Scenario
• Exploration phase (2010–2020)
• Pipeline construction phase (2020–2025)
- Dempster lateral pipeline to Mackenzie Valley Pipeline
- Transportation and distribution infrastructure
• Production phase (2025–2055; 2.0 trillion cubic feet production)
Oil Scenario
• Exploration and testing (current–2012)
• Production of local fuel oil (2012–2055; 2.74 million barrels production)