| Land use sector | Description | ||
| Oil and gas |
Study Area: Eagle Plain Scenario Summary: |
||
| Natural Gas Scenario | |||
|
• Exploration phase (2010–2020) • Pipeline construction phase (2020–2025) - Dempster lateral pipeline to Mackenzie Valley Pipeline - Transportation and distribution infrastructure • Production phase (2025–2055; 2.0 trillion cubic feet production) |
|||
| Oil Scenario | |||
|
• Exploration and testing (current–2012) • Production of local fuel oil (2012–2055; 2.74 million barrels production) |
|||