Dam Dam Height (m) Dam Length (m) Hydropower capacity (Mw) Distance to Ocean (km) Proposed Action for Fish Proposed Action for Power
Veazie 6 327 8.4 55 Removal Offline
Great Works 6 435 7.7 69 Removal Offline
Milford 6 427 6.4 73 State-of-the-art fish passage under construction Increase
West Enfield 7 296 13.0 114 Fish passage exists (vertical slot fish ladder) Increase
Medway 11 541 19.2 175 Future Increase
Orono 8 343 2.3 63 Future New Power
Stillwater 6 539 1.9 67 Future Increase
Howland 6 201 1.9 112 Bypass Offline