Fig. 3. The design for the fish bypass at Howland Dam, seen in photo. The Red arrows point to the same structure in each image. In the lower image, the narrow blue channel just below the red arrow is the fish bypass (images provided by MMI Engineering courtesy of the Penobscot River Restoration Trust).
Fig. 3