Fig. 11. Demand vs. supply profiles after a shock to headgate infrastructure. (A) Two scenarios of water flow as repairs to headgate are made. (B) Comparisons of open flow (solid), 12-hour rotations (dashed), and 24-hour rotations (dash-dot). The color coding is as follows: Red- by the 5th day infrastructure is sufficiently repaired to allow for a portion of the water to flow into the system. Blue- it takes 8 days until infrastructure is sufficiently repaired to allow for a portion of the water to flow into the system.

Fig. 11