Fig. 4. A large wood (LW) structure deployed at Little Topashaw Creek. (A) Design plan and profile. (B) LW structure 5 months after construction; note sediment deposits within the structure. (C) The same structure in (B) 9 months after construction. (D) The same structure in (B) completely disappeared 3 yr after construction.