Fig. 2. Operation of a series of dams for hydropower and flood control on the Roanoke River in North Carolina, USA results in lowered flood peaks followed by frequent, short-duration high-flow pulses caused by releases of water from turbines to generate electricity. Note that flows in April drop lower than natural during a period in which dam releases are curtailed to restore reservoir levels (based on 1945 data).